Federal contract opportunity
15--STIFFENER,AIRCRAFT
Key facts (from SAM.gov)
- Solicitation number
- SPE4A727T5092
- Agency
- DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA AVIATION.DLA AV RICHMOND.DLA AVIATION
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 336413
- Place of performance
- Not stated
- Posted
- Nov 26, 2026
- Response deadline
- Dec 4, 2026
- Point of contact
- Questions regarding this solicitation should be emailed to the buyer listed in block 5 of the solicitation document which can be found under the Additional Information link. If the Additional Information link does not work, please go to https://www.dibbs.bsm.dla.mil/Solicitations/ and type the solicitation number in the Global Search box. · DibbsBSM@dla.mil
About this solicitation
Proposed procurement for NSN 1560016856253 STIFFENER,AIRCRAFT: Line 0001 Qty 18 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0150 DAYS ADO The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
Briefing sourced from the official SAM.gov notice. Details change — always verify dates and requirements in the solicitation documents before bidding.
Thinking of bidding on this one?
Get an AI breakdown with cited answers, teaming-partner matches, and a compliance checklist — free to explore.
Related opportunities (NAICS 336413)
- C-5 Fire Suppression System Repair
Small Business Set Aside - Total Due Nov 27, 2026
- A-10 Rotor and Stator Brakes
Due Nov 27, 2026
- 16--IDG,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF
Due Nov 27, 2026
- REQUEST FOR INFORMATION/ SOURCES SOUGHT – Manufacturing of Machined and Composite Parts, along with Additive Manufacturing (3D Printing)
Small Business Set Aside - Total Due Nov 27, 2026
- 16--GENERATOR CONTROL U, IN REPAIR/MODIFICATION OF
Due Nov 27, 2026
- SUPPORT,BEARING
Due Nov 27, 2026