Federal contract opportunity

USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CA

Key facts (from SAM.gov)

Solicitation number
W9123826BA010
Agency
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH PACIFIC.ENDIST SACRAMENTO.W075 ENDIST SACRAMENTO
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990
Place of performance
Not stated
Posted
Jul 30, 2026
Response deadline
Sep 10, 2026
Point of contact
Melita Doyle · melita.s.doyle@usace.army.mil · 9165576611

About this solicitation

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-bid-build (DBB) construction services to be performed in support of the Natomas Reach I Contract 2 (RIC2) at Sacramento, California (CA). The project supports the American River Common Features (ARCF), Natomas Basin Project, located within the great Sacramento region of California. RIC2 is a continuation of Contract 1 which provided cutoff walls for seepage mitigation in the levees for the entire reach of Natomas Reach I, extending from Northgate Boulevard to Gateway Oaks Drive along the American River…

Briefing sourced from the official SAM.gov notice. Details change — always verify dates and requirements in the solicitation documents before bidding.

Thinking of bidding on this one?

Get an AI breakdown with cited answers, teaming-partner matches, and a compliance checklist — free to explore, then unlock this opportunity for a one-time price from $9. No subscription required.

DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH PACIFIC.ENDIST SACRAMENTO.W075 ENDIST SACRAMENTO Not stated Melita Doyle